cubic meters per day open cut mining equipment list

Popular search, learn more.

3 CALCULATION OF MACHINE RATES

31 Introduction The unit cost of logging or road construction is essentially derived by dividing cost by production In its simplest case if you rented a tractor with operator for 60 per hour - including all fuel and other costs - and you excavated 100 cubic meters per hour your unit cost for excavation would be 060 per cubic meter...

How much labour is required for excavating the soil of 1

Answer 1 of 5 A good man can dig a cube of soil out in a morning If harder soil such as heavy clay it takes all nearly day A JCB will dig a cube out in a few minut A 300 PC in a few seconds...

Excavation Calculator

This calculator will calculate the volume of excavated material using the length and width of the excavation in feet and the excavation depth from an average of four points It will calculate the volume increase of the material using the swell/bulking percentage from Bank to Loose volume A dump truck holds anywhere from 10 to 14 cubic yards of...

Cost Estimating Guide for Road Construction

Sep 08 2020 0183 32 Table 55 Cost per Loose CY and Ton for Initial Spreading in Idaho and Montana 74 Table 56 Cost per Loose CY And Ton for Grid Rolling in Idaho and Montana 74 Table 57 Cost Per Loose CY and Ton for Grading of Aggregate Base or Surface Course in Idaho and...

Groundwater impact of open cut coal mine and an assessment

Sep 01 2017 0183 32 Open cut coal mining in New South Wales has resulted in mine pit depths of 150 m or more below the natural water table and the backfilling and reshaping of more than 10 billion cubic meters of spoils waste rock Groundwater can represent a problem during surface mining and its removal can prove costly...

Earth moving Equipment function and standard Productivity

Feb 16 2013 0183 32 Earth moving Equipment are used in the construction projects in order to prepare a plan and time schedule for such activities you should be aware of different types of Earth moving Equipment and the productivity for each Equipment how much cubic meter of soil can be moved or excavated in a certain amount of time or how fast material can be transported...

Excavation Costs Prices

1 30000 to 1 50000 per day for backhoe loader 8 hours 2 00000 to 2 40000 per day for excavator 8 hours 1 50000 to 1 70000 per day for trencher 8 hours We are a construction company that enter into contracts that have a payment schedule for owners contractors to follow per agreement by both parties Reported by...

Carl van Vuuren

The block height of the cave reaches a record 450 meters in the centre increasing up to 700 meters on the periphery rendering Palabora a world-class mine Geographically the production footprint is very small measuring Palabora Mining Company operates a successful underground block-cave mine producing 80 000 tonnes of copper ore per annum...

TECHNICAL CALCULATION AND ESTIMATOR S MAN

iv process equipment v storage tanks cylindrical and spheroidal vi welding and flame cutting vii corrosion protection viii thermal insulation ix estimates x piping above ground estimate points for build-in items xi weight factors xii technical calculation manner of datas compiling xiii man hours for overhauls in petrochemical plants xiv...

BLASTING TECHNICAL INFORMATION

blast gun body Air volumes are measured by surface cubic feet per minute scfm The larger the orifice ID opening the larger volume of air/media Other factors that affect volume of air into the blast system is media and air hose diameter Increased air pressure PSI also increases the SCFM with a given size orifice...

Major Mines Projects

Cerro Verde is an open-pit copper and molybdenum mining complex that has been in operation since 1976 The available fleet consists of fifty 290-metric ton haul trucks and ninety-three 230-metric ton haul trucks 21 of which are currently on standby loaded by thirteen electric shovels with bucket sizes ranging in size from 33 to 57 cubic meters and two hydraulic shovels with a bucket size of...

Excavator Bucket Sizes Types

Flexibility each job requires with the performance and productivity you expect Buy buckets blades adapters and other machine attachments for your specific application Reman parts offer the same quality as new parts at a fraction of the cost Buy the parts you need to get the job done...

Centrifugal Pump Selection Guide

See page 4-5 table for list of eight color-coded market designations Company Overviews Goulds Pumps ITT Goulds Pumps is among the most widely recognized and respected brands in the global pump industry serving customers in the oil and gas mining power generation chemical pulp and paper and general industrial markets As the only...

Major Mines Projects

The available mining fleet consists of eleven 177-metric ton haul trucks loaded by two hydraulic shovels with bucket sizes of 34 cubic meters which are capable of moving an average of 90 000 metric tons of material per day...

Topic 5 Mining Methods

Nov 02 2011 0183 32 Topic 5 Mining Methods-Part I-Surface mining 1 Topic 5 Mining Methods Part I-Surface mining Hassan Z Harraz hharraz2006 yahoo 2010- 2011 Prof Dr HZ Harraz Presentation This material is intended for use in lectures presentations and as handouts to students and is provided in Power point format so as to allow customization for the individual needs of course...

UNIT RATES FOR DEMOLITION RECLAMATION AND RELATED

213 Light/Medium plant structures Rands R 212 08 /m² Up to 150 kg of steel per square meter Includes sheeting 214 Medium/heavy plant structures Rands R 1 395 24 /m² Up to 300 kg of steel per square meter Includes sheeting 215 Heavy plant structures Rands R 2 120 76 /m² Up to 1000 kg of steel per square meter Includes sheeting...

Mining Cost Service

Mining Cost Service is the industry standard reference for Mining Cost Estimation This system places cost estimating data at your fingertips with conveniently indexed information to make your cost estimates faster easier and more credible Monthly updates assure that...

Excavation Cost Calculator Estimate Excavation Cost

Excavation Cost Definition Use our excavation cost calculator to instantly calculator how much an excavation job will cost Enter the length width and depth of the area that needs to be excavated and the cost per yard and our calculator will return the total cost of excavation...

Mining KPIs Example KPIs Performance Metrics for

Example KPIs for Mining Average bucket weight Average fuel use per machine Average loading time Average number of dumps per hour/day/week/month Average number of loads per hour/day/week/month Average payload Average swing time Cash operating costs per barrel of oil equivalent BOE...

Major Mines Projects

The available mining fleet consists of thirty-seven 235-metric ton haul trucks loaded by six shovels with bucket sizes ranging from 34 to 47 cubic meters which are capable of moving an average of 358 000 metric tons of material per day Crushing and Grinding Processing Sulfuric acid reagent...

Oil India Ltd Oil India makes gas discovery in Assam

Nov 13 2020 0183 32 The discovery will open up new areas for further oil and gas exploration in Assam and would help in enhancing the gas production with future appraisal and development activities the company said in a statement Oil India Ltd OIL said well Dinjan-1 in Tinsukia petroleum mining lease PML in the upper Assam basin struck hydrocarbons...

MINING Equipment List Mining Tools Names Underground

Jun 30 2019 0183 32 Mining equipment list Mining Machine List Open-pit mining equipment Dragline excavator It can excavate 240 000 tons of coal or 240 000 cubic meters of wastewater per day the equivalent of a 30-meter-deep soccer field do not require the use of explosives for extraction These rocks can be cut with the mining tools provided by...

Cost of Stoping for Underground Mining

Apr 05 2017 0183 32 Expressed in another way the sorting cost per ton of run-of-mine ore is 195/651 or 030 The cost of mining 1 ton of run-of-mine ore is 234 The cost of transporting ore from the mine to the mill on contract is 1 per ton The milling cost of run-of-mine ore is taken as 285 and the cost of milling the sorted product is 322 per ton...

Operating Cost for Miners SRK Consulting

Operating Cost for Miners SRK Consulting Opening a new mine or expanding an existing operation can be a challenging and daunting task Aside from assessing and evaluating social-environmental concerns and designing the mining and material movement approach the first question often asked is how much will it cost us to mine This may need...

Overview Classic Calculation Routines

Jul 31 2020 0183 32 Cost per Unit = Travel Time / 60 Truck Cost per Hour / Volume per Load Number of Trucks Helps calculate the number of trucks needed per day to haul a load using the load volume and time available Calculations Trucks Required per Day = Total Units / Hours per Day / Units per Load Hours per Round 1 Trucking Routine by Segments...

10 000 cubic meters per day open cut mining equipment list

10 000 cubic meters per day open cut mining equipment list 05 Jun 2012 Gulin supply Mining and construction equipment for mineral handling The crushing screening washing grinding equipment in stationary portable tracked type is available Also turnkey projects of crushing plant powder plant...

Modeling for the Steady State Production of Large Open

production exceeds to 10 000 tons per day is considered to be the large opencast min For the open-cut mining or open cast mining is a method of extracting rock or minerals mining cost reclamation cost per ton of minerals / cost per cubic meter of over burden by the...

Major Mines Projects

The available mining fleet consists of thirty-five 240-metric ton haul trucks loaded by four shovels with bucket sizes ranging from 31 to 48 cubic meters which are capable of moving an average of 235 000 metric tons of material per day...

Reclamation Methods Encyclopedia

The sailing time is dependent upon the distance between the borrow source and the reclamation area If the source is close to the reclamation area many trips per day are possible In such a situation as much as 40 million m 3 per month of production is possible with the trailer suction hopper dredger Figure 66 shows a dredging operation...

PDF COST ESTIMATION FOR OPEN PIT MINES TACKLING COST

21 Cost Categorization In this paper costs in open pit mines are categorized into four groups 1 capital costs 2 operating costs 3 general and administrative G A costs and 4 fixed...

CHAPTER 5 ESTIMATING WORK ITEMS COSTS IDIRECT COSTS

one cubic meter of soil that is excavated from the ground may occupy 125 cubic meters after it is loosened and placed in the hauling unit After the soil is compacted in place it may occupy 09 cubic meter The soil to be excavated is called bank measure in its undisturbed condition prior to excavating or after being compacted in place...

Rate Analysis of Excavation in Earthwork

Its cost per day including driver and fuel is Rs 5000 Then the cost of 10m 3 of excavation can be calculated as No of days required for 10m 3 excavation = 10/2424242 = 004125 days The cost of hydraulic excavator for 10m 3 excavation = 004125x5000 = Rs20625 Likewise based on the capacity of other equipment labors etc their cost is...

Environmental Consequences of Open Pit Mining

Mar 14 2012 0183 32 The mill processes 20 000 tons of rock per day In early August 2014 a tailings pond dam at the mine failed releasing at least 10 million cubic meters of contaminated water and waste rock into a local creek expanding its width from four feet to 150 feet before entering nearby Quesnel Lake and its connected waterways which are important...

How to Estimate the Cost of Mechanical Dredging

months per year current fuel price per gallon and economic and local factors The example shown in this paper does not include a detailed calculation of monthly equipment costs Overview of Labor Labor consists of personnel necessary for the operation of the dredge and attendant plant and equipment...

Froth Flotation Equipment

Two possible flotation configurations for a 500 metric ton per day installation are presented in Figure 5 The computational basis assumes 30 percent solids in rougher flotation 20 percent solids in cleaner recleaner and cleaner-scavenger flotation a ratio of concentration in rougher flotation of 307 an overall ratio of concentration of 50...

Mining with Backfill

This model should include the material available the location of the mine and the mining operation In this evaluation a copper orebody is located between 500m and 1 000m and is mined with a 2 grade producing 1 880 tonnes of ore per day and 1 840 tonnes of tailings or 607 200 tonnes per year assuming a 330 day operational year...