Standard Specifications for Roads and Structures

Specifications by Standard Special Provisions which are unique to a select group of projects or by Project Special Provisions which are unique to the specific bid proposal or contract Working titles have a masculine gender such as workman workmen and foreman...

III TECHNICAL SPECIFICATIONS DIVISION 50 MILLING

III TECHNICAL SPECIFICATIONS DIVISION 50 MILLING/PROFILING EXISTING ASPHALTIC SURFACE AND ROADWAY PREPARATION 5001 SCOPE The Contractor shall furnish all materials equipment and labor necessary to mill/profile existing asphaltic surfaces roadway prep arations and shall consist of one or m ore...

Specifications

Final Specifications TS 1 of TS 119 TECHNICAL SPECIFICATIONS RURAL ROAD / RIO SALADO PARKWAY INTERSECTION IMPROVEMENTS City of Tempe Project No CIP 5409581 City of Tempe Engineering and Transportation Department 31 E 5 th Street Tempe AZ 85281 December 3 2019 12-3-2019...

technical specification mill existing pavement

230 Pavement Reclamation rev1703 - townofwindsorct TECHNICAL SPECIFICATION 230 PAVEMENT RECLAMATION PAGE 1 of 4 Rev The existing road pavement shall be pulverized and mixed with the base course material designed to mill or shred the existing bituminous concrete rather than to crush or fracture it are not considered capable of achieving...

New Caltrans pavement smoothness specifications

Mar 24 2019 0183 32 New Caltrans pavement smoothness specifications 1 Implementation of the Revised Caltrans Pavement Smoothness Specification Tom Pyle Chief - Caltrans Office of Asphalt Pavements Don Matthews Pavement Recycling Systems Inc Spring Asphalt Pavement Conference and Equipment Expo March 21 2019 2 Smoothness Overhaul...

SAMPLE ROAD/STREET PAVING SPECIFICATIONS

at locations where the new pavement surface meets existing pavement surfac Payment will be per square yard of area milled 210 Upon completion of the paving work the Contractor shall grade the pavement shoulders to a minimum width of three 3 feet with a uniform slope from the edge of the new pavement surface to the existing shoulder...

RECOMMENDED GUIDE SPECIFICATIONS FOR LONG LIFE

The guide specifications developed by the SHRP2 R23 team are presented in this document They are organized into three sections which are 1 guide specifications for pavement components that are not contained within the AASHTO Guide Specifications 2 elements that can be added to or otherwise modify existing AASHTO Guide Specifications and...

Standard Specifications for Rigid Pavement Regional Office

existing pavement as the case may be in accordance with the requirements of these specifications The material shall be laid in one or more layers as necessary to lines grades and cross-sections shown on the approved drawings or as directed by the engineer 332 The thickness of a single compacted Wet Mix Macadam layer shall not be less than...

TABLE OF CONTENTS TECHNICAL SPECIFICATIONS

The contractor shall mill the existing asphalt surface and restoration areas to a depth of 2 Payment for Pavement-Milling Hot-Mix 2 Depth shall be made per Square Yard SY in accordance with Section 760 of the DelDOT Standard Specifications 6 Base Repairs...

ADDENDUM No 2

3 Under Technical Specifications Section 1150 Pavement Micro-Milling I Under Section a General ADD the following paragraph With the exception of reporting to Caltrans and references to HMA overlay the pavement micro-milling shall be in accordance with Section 36-3 Pavement...

STANDARD SPECIFICATIONS FOR HIGHWAY AND BRIDGE

Some of the symbols for units of measurement used in the Specifications and in the Bid Schedule are defined as shown in Table 1013 1 Measurement Symbols The symbols for other units of measurement used in the Specifications are as defined in the various Specifications and tests referenced in the Specifications Table 1013 1...

CONTRACT DOCUMENTS TECHNICAL SPECIFICATIONS

remove existing pavement in this area and grade to provide positive drainage 3 - 4 pvc conduits with quazite box proposed alternate 3 mill overlay 2 existing boat ramp parking area contractor shall fill provide topsoil in the existing drainage swale and grade area to provide positive drainage 844 822 774 774 787 798 786 784...

SECTION 02745 PAVEMENT REMOVAL AND

Specifications are referred to herein and are hereby made a part of this Contract to the extent of such references and shall be as binding upon the Contract as through reproduced herein in their Where trenches are located out of the existing pavement and damage occurs to the pavement that pavement shall also be replaced by the Contractor...

SECTION 607 MILLING ASPHALT PAVEMENT

NCDOT 2012 Standard Specifications Section 607 27 Mill the existing pavement to restore the pavement surface to a uniform longitudinal profile 28 and cross section in accordance with typical sections shown in the plans Where indicated in 29 the contract remove pavement to a specified depth and produce a specified cross slope...

City of Millbrae

306 Damage to Existing Surface or Pavement Markers and Markings 307 Pavement Marking and Striping 39-6 of State Standard Specifications surface of pavement shall be brought to a true grade and cross Technical Provisions and shall be constructed on...

CITY OF FRIENDSWOOD ASPHALTIC CONCRETE TECHNICAL

TECHNICAL SPECIFICATIONS PAVEMENT 02800-1 City of Friendswood Revised 7/10/2008 SECTION 02800 milling of existing pavement tack coat and placement and compaction of asphalt Measurement of speed hump is along Mill pavement concrete or asphalt to depth of one inch 1 In and width between eighteen inches...

specifications of milling machines

SECTION 327 MILLING OF EXISTING ASPHALT PAVEMENT Various mill manuals including operation manuals maintenance guides parts lists and brochur SECTION 327 MILLING OF EXISTING ASPHALT PAVEMENT 327-1 Description Remove existing asphalt concrete pavement by milling to improve the rideability and Technical Specification for CNC...

PART 1 GENERAL

AWhere parts of the existing concrete curb sidewalk driveways and asphaltic or Portland cement concrete pavement is to be removed at locations other than contraction or isolation joints the existing concrete or asphalt shall be sawed with a concrete saw to the full depth of the existing slab or curb...

REQUEST FOR PROPOSAL FOR PARKING LOT REPAIR FOR THE

WORK SPECIFICATIONS Repaving -Mill / remove existing asphalt pavement down to original base material -Fill or adjust base material as necessary to allow for proper drainage of final pavement surface -Install a total of 4 of new asphalt pavement in two lifts -Rolled and compacted with a 4-6 ton roller -All Paving to be machine installed...

Chapter 3 Pavement Patching and Repair

the life of a pavement and to identify pavement distress It must be noted that proper documentation and communication is of greatest importance This will be developed in greater detail as this chapter progress 3-2 Reference Standard Specifications for Road Bridge and Municipal Construction M 41-10 Asphalt Institute...

Standard Specifications for Construction and Maintenance

OUTLINE OF SPECIFICATIONS Each specification is outlined by Articles and Sections The basic Articles required for a specification are 1 DESCRIPTION 2 MATERIALS 3 EQUIPMENT 4 CONSTRUCTION OR WORK METHODS 5 MEASUREMENT 6 PAYMENT Some Articles are not used in every Item Measurement and Payment Articles are combined when the work described is...

Road Standards and Paving Standards

Road Standards and Paving Standards ASTM s road and paving standards provide the specifications and test methods pertinent to the material physical mechanical performance and application requirements of road surfaces and pavements These geotechnical surfaces are laid down on specified areas intended to sustain either or both foot and...

Best Practices Handbook on Asphalt Pavement Maintenance

Specifications technical memoranda and special provisions are included for all treatment methods recommended in the 1 7 1 ocurnenl Analysisi1 escriptots -7-- maintaining and preserving existing pavement surfac This shift has resulted in three types of pavement maintenance operations Preventive Maintenance...

Pavement Scarification/Milling

Overview Grimes Asphalt and Paving is capable of milling existing pavements to any depth you need whether milling full-depth to remove pavement or milling off a couple of inches to resurface With a wide range of equipment Grimes Asphalt and Paving has the right machine for your job Depending on your needs it might be preferable to mill...

Pavement milling

Pavement milling cold planing asphalt milling or profiling is the process of removing at least part of the surface of a paved area such as a road bridge or parking lotMilling removes anywhere from just enough thickness to level and smooth the surface to a full depth removal There are a number of different reasons for milling a paved area instead of simply repaving over the existing...

ยป Pavement Recycling

Pavement Recycling is a technique where an existing degraded pavement is modified and transformed into a homogeneous structure that can support the traffic requirements Materials from the existing pavement are reused in the construction of a new layer and can result in considerable savings of material money and energy...

Specification 316 Cold Milling Asphalt Pavement

Section 3 Specification 316 Cold Milling Asphalt Pavement 14 MAY 99 1 316 COLD MILLING ASPHALT PAVEMENT 3161 GENERAL 31611 Description Cold milling asphalt pavement is the process of removing existing pavement from the roadway to the lines...

COUNTY OF COOK

PGE PCC Pavement shall be built per the IDOT Standard Specifications for Road and Bridge Construction Art 420 The PGE sub base shall be built per the IDOT Standard Specifications for Road and Bridge Construction Art 207 and 100405 30 PCC Patching shall match the existing pavement thickness The patch length shall be a minimum of 6 feet...

PennDOT LTAP technical PAVING PROJECT INSPECTION

selection for the project The existing pavement structure must be repaired to a stable condition in order to provide a good base for a surface overlay Prior to the start of the project the inspector should become familiar with the plans specifications and contract documents and understand the exact type of materials specified by...

Project Specifications and Contract Documents For Mill and

Mill Existing Asphalt Pavement - 3 Nominal Depth 22177 SY 13 32613aSP 3 Polymer Modified 3/4 Asphalt Fiber Mix with Fiber Mesh Overlay 3742 TON 14 32613bSP Pavement Repair Type 1 1200 SF 15 3401SP Remove and Replace Existing Vertical Curb and Gutter Type A Quad City Std Dtl 220Q-1 60 LF 16 3402SP Remove and Replace...

TECHNICAL SPECIFICATION 231 MILL EXISTING PAVEMENT

TECHNICAL SPECIFICATION 231 MILL EXISTING PAVEMENT PAGE 2 of 4 limiting the amount of dust escaping from the milling and removal operation in accordance with local State and Federal air pollution control laws and regulations...

46 Design drawings and technical specifications

Technical specifications may specify a performance goal a performance specification or procedures used to meet the performance goal design specification A performance specification permits flexibility and from a 3D model of the existing and planned surfaces topography to allow horizontal and vertical control...

SPECIFICATIONS FOR ROADWAY AND

350-0200 PAVEMENT - Cement Concrete Driveways 380 MILLING AND RESURFACING OF EXISTING ASPHALTIC CONCRETE PAVEMENT AND ROADWAY BASE 46 400 CONCRETE in accordance with the Pinellas County Standard Technical Specifications for Roadway and General Construction PC Std Tech Spec contained herein as amended by technical special...